Biennial Bridge Inspection Assignment (2019-2024)Biennial Bridge Inspection Assignment (2019-2024)Biennial Bridge Inspection Assignment (2019-2024)Biennial Bridge Inspection Assignment (2019-2024)
  • Home
  • About Us
  • Services
  • Projects
  • Team
  • Careers
  • Contact
✕
  • BAYVIEW AVENUE BRIDGE OVER WEST DON RIVER (2019)
    Projects Bayview Avenue Bridge Over West Don River (2019 – Ongoing) Inspection, Evaluation, Recommendation City of Toronto – Toronto, Ontario The objective was to complete site […]
  • Don Valley Parkway and Eastern Avenue Interchange (2021 – 2022)
    Projects Don Valley Parkway and Eastern Avenue Interchange (2021 – 2022) Detailed Inspection and Structural Evaluation City of Toronto – Toronto, Ontario The Don Valley Parkway […]
  • Prairie Siding Swing Bridge
    Projects Prairie Siding Swing Bridge Condition Assessment/Load and Fatigue Evaluations/Rehabilitation Chatham – Kent, Ontario The Prairie Siding Swing Bridge is a four-span bridge over the Thames […]
  • MTO Northwest Region – Underwater Inspections (2022)
    Projects MTO Northwest Region – Underwater Inspections (2022) OSIM/Underwater Inspections. MTO Northwestern, Ontario Doug Dixon & Associates Inc. (DDA) was retained by the MTO Northwest Region […]
  • Oxford Road 45 Bridge
    Projects Oxford Road 45 Bridge Inspection and Evaluation Oxford County, Ontario The Oxford Rd 45 Bridge was originally constructed in 1971 and spans over the Thames […]
  • Biennial Bridge Inspection Assignment (2019-2024)
    Projects Biennial Bridge Inspection Assignment (2019-2024) OSIM INSPECTIONS City of Toronto – Toronto, Ontario Ongoing multi-year assignment for the biennial visual inspection, in accordance with OSIM, […]

GET IN TOUCH

Email
ddixon@dougdixonassociates.com

Phone
+1(647)405-0523

Address
2 County Court Blvd, Suite 345,
Brampton, ON, L6W 3W8